Directions to Solve

Industrial Engineering and Production Management - Section 1

41. 

Work sampling is applied for

A. estimation of the percentage utilisation of machine tools
B. estimating the percentage of the time consumed by various job activities
C. finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible
D. all of the above

Answer: Option D

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

42. 

A systematic job improvement sequence will consist of

A. motion study
B. time study
C. job enrichment
D. all of these

Answer: Option D

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

43. 

Production cost refers to prime cost plus

A. factory overheads
B. factory and administration overheads
C. factory, administration and sales overheads
D. factory, administration, sales overheads and profit

Answer: Option A

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

44. 

In inventory control theory, the economic order quantity is

A. average level of inventory
B. optimum lot size
C. capacity of a warehouse
D. lot size corresponding to break-even analysis

Answer: Option B

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

45. 

In value engineering, the term value refers to

A. manufacturing cost of the product
B. selling price of the product
C. total cost of the product
D. utility of the product

Answer: Option D

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

46. 

The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)

 

A. 741-71-1
B. 741-71-2
C. 741-71-3
D. 741-71-4

Answer: Option D

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

47. 

The main object of scientific layout is

A. to produce better quality of product
B. to utilise maximum floor area
C. to minimise production delays
D. all of these

Answer: Option D

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

48. 

Gantt chart is used for

A. inventory control
B. material handling
C. production schedule
D. machine repair schedules

Answer: Option C

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report