25. 

The determination of standard time in a complex job system is best done through

A. stop watch time study
B. analysis of micromotions
C. grouping timing technique
D. analysis of standard data system

Answer: Option D

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

26. 

A diagram showing the path followed by men and materials while performing a task is known as

A. string diagram
B. flow process chart
C. travel chart
D. flow diagram

Answer: Option D

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

27. 

A device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable is called

A. hoist
B. jib crane
C. portable elevator
D. chain conveyor

Answer: Option A

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

28. 

The type of organisation preferred for a steel industry, is

A. line organisation
B. functional organisation
C. line and staff organisation
D. line, staff and functional organisation

Answer: Option D

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

29. 

The chart which gives an estimate about the amount of materials handling between various work stations is known as

A. flow chart
B. process chart
C. travel chart
D. operation chart

Answer: Option C

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

30. 

Linear programming model can be applied to line balancing problem and transportation problem.

A. True
B. False

Answer: Option A

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

31. 

PERT is an event oriented technique.

A. Correct
B. Incorrect

Answer: Option A

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

32. 

Line organisation is suitable for a big organisation.

A. Correct
B. Incorrect

Answer: Option B

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report