Industrial Engineering and Production Management - Section 1 (3)

  • Home
  • Mechanical Engineering
  • Mechanical Engineering Q&A
  • Industrial Engineering and Production Management - Section 1
Directions to Solve

Industrial Engineering and Production Management - Section 1

17. 

In order to avoid excessive multiplication of facilities, the layout preferred is

A. product layout
B. process layout
C. group layout
D. static layout

Answer: Option B

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

18. 

PERT analysis is based upon

A. optimistic time
B. pessimistic time
C. most likely time
D. all of these

Answer: Option D

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

19. 

A-B-C analysis is used in

A. CPM
B. PERT
C. inventory control
D. all of these

Answer: Option C

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

20. 

Work study involues

A. only method study
B. only work measurement
C. method study and work measurement
D. only motion study

Answer: Option C

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

21. 

Which of the following are the guidelines for the construction of a network diagram?

A. Each activity is represented by one and only one arrow in the network.
B. Dangling must be avoided in a network diagram.
C. Dummy activity consumes no time or resource.
D. all of the above

Answer: Option D

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

22. 

In a line organisation

A. responsibility of each individual is fixed
B. discipline is strong
C. quick decisions are taken
D. all of these

Answer: Option D

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

23. 

If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be

A. TR
B. 739-46-1
C. TR + (S - T)R
D. 739-46-2

Answer: Option D

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

24. 

In CPM, the cost slope is determined by

A. mcq08_03300
B. 742-78-2
C. 742-78-3
D. 742-78-3 (1)
E. 742-78-4

Answer: Option B

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report