Industrial Engineering and Production Management - Section 1 (2)

  • Home
  • Mechanical Engineering
  • Mechanical Engineering Q&A
  • Industrial Engineering and Production Management - Section 1
Directions to Solve

Industrial Engineering and Production Management - Section 1

9. 

Direct expenses include

A. factory expenses
B. selling expenses
C. administrative expenses
D. none of these

Answer: Option D

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

10. 

In big automobile repair shop, for elevating and moving the heavy parts such as complete engine assembly, gear box etc., an overhead crane and a fork lift truck is used.

A. Yes
B. No

Answer: Option A

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

11. 

The routing function in a production system design is concerned with

A. manpower utilisation
B. quality assurance of the product
C. machine utilisation
D. optimising material flow through the plant

Answer: Option C

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

12. 

Job evaluation is the method of determining the

A. relative values of a job
B. worker's performance on a job
C. worth of the machine
D. value of overall production

Answer: Option A

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

13. 

Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?

A. Halsey plan
B. Gantt plan
C. Rowan plan
D. Emerson's efficiency plan

Answer: Option A

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

14. 

Dispatching

A. prescribes the sequence of operations to be followed
B. determines the programme for the operations
C. is concerned with the starting of processes
D. regulates the progress of job through various processes

Answer: Option C

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

15. 

Simplex method is the method used for

A. value analysis
B. network analysis
C. linear programming
D. queuing theory

Answer: Option C

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

16. 

In A-B-C analysis, which class of items are generally large in number?

A. A
B. B
C. C
D. none of these

Answer: Option C

Explanation:

No answer description available for this question.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2026 IndiaBIX. All Rights Reserved.

Report