9. | The discharge over a trapezoidal crest of a Sarda fall with free over fall conditions, is
|
|||||||
Answer: Option C Explanation: No answer description available for this question. Let us discuss. |
10. | The depth of the crest of a scouring sluice below the crest of a head regulator, is generally kept |
|||||||||
Answer: Option B Explanation: No answer description available for this question. Let us discuss. |
11. | The saturation line is the line up to which banks get saturated after the canal runs for some time. The saturation gradient in ordinary loam soil, is generally |
|||||||||
Answer: Option C Explanation: No answer description available for this question. Let us discuss. |
12. | The intensity of irrigation means |
|||||||
Answer: Option A Explanation: No answer description available for this question. Let us discuss. |
13. | The depth of rice root zone, is |
|||||||||
Answer: Option E Explanation: No answer description available for this question. Let us discuss. |
14. | The crest level of a canal diversion head work, depends upon |
|||||||||
Answer: Option D Explanation: No answer description available for this question. Let us discuss. |
15. | If the straight sides of a triangular section of a lined canal with circular bottom of radius R, make an angle θ with horizontal, the perimeter of the canal is |
|||||||||
Answer: Option D Explanation: No answer description available for this question. Let us discuss. |
16. | For the conditions enumerated to provide a crossing at C1 You will probably provide |
|||||||