IndiaBIX
IndiaBIX
Start typing & press "Enter" or "ESC" to close
  • Home
  • Jobs
  • Results
  • Current Affairs
  • GK
  • Online Test
  • HR Interview
  • BLOG

Docks and Harbours - Section 1 (4)

  • Home
  • Civil Engineering
  • Civil Engineering Questions and Answers
  • Docks and Harbours - Section 1
Directions to Solve

Docks and Harbours - Section 1

There are many questions available related to Dock and Harbors and you
can solve these MCQs easily by just clicking this section.

25. 

Cretans :

A. are the harbours established on the island south east of Greek mainland
B. are the natives of crete, an island south of Greek mainland
C. are the plants, grown in the neighbourhood of harbours
D. none of the above.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

26. 

The important component of a sea port is

A. terminal buildings
B. the docks
C. the harbour
D. all of these.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

27. 

Which one of the following statements is not relevant to hydrographic survey :

A. establishment of a chain of bench marks near the shore line
B. establishment of horizontal control points on the shore
C. determination of the sea bed profile
D. depicting the irregularities in the shore line, islands and projecting rocks
E. none of these.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

28. 

The shore line survey includes :

A. depicting the shore line
B. depicting the prominent details on shore line
C. depicting the high water line
D. depicting the low water line
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

29. 

The smoothened surface of the front face of the guay walls, is known as fending which is made of

A. granite stone
B. timber
C. steel
D. all the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

30. 

A lead line or sounding line

A. is stretched thoroughly when wet before it is graduated
B. should be soaked in water for about one hour prior to taking soundings
C. is adjusted at regular interval
D. is generally used for depths exceeding 6 m
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

31. 

Which one of the following land marks on the coast line must be depicted on hydrographic maps ?

A. shore line
B. light houses
C. church spires
D. all the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

32. 

Depth of borings for soil investigation, is generally kept below low water level

A. 30 m
B. 35 m
C. 45 m
D. 40 m

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report