Construction Management - Section 1 (3)

  • Home
  • Civil Engineering
  • Civil Engineering Questions and Answers
  • Construction Management - Section 1
Directions to Solve

Construction Management - Section 1

In this portion, there are many questions available to solve
which are related to construction management and every question is important.

17. 

Pick up the correct network for the activities of pouring concrete, erection of form work, removal of form work and curing of concrete from the following:

A. 1. Pouring of Concrete 2. Erection of form work 3. Curing of concrete 4. Removal of form work
B. 1. Erection of form work 2. Pouring of concrete 3. Curing of concrete 4. Removal of form work
C. 1. Removal of form work 2. Erection of form work 3. Pouring of concrete 4. Curing of concrete
D. 1. Pouring of concrete 2. Curing of concrete 3. Erection of form work 4. Removal of form work

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

18. 

Construction team means

A. an engineer
B. an architect
C. an owner
D. a contractor
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

19. 

Critical path lies along the activities having total float

A. positive
B. negative
C. zero
D. same.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

20. 

CPM is

A. synthesising in concepts
B. is built of activities oriented programme
C. is based on time estimate
D. is used for repetitive works
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

21. 

Critical path method

A. is an improvement upon bar chart method
B. provides a realistic approach to daily problems
C. avoids delays which are very common in bar charts
D. was invented by Morgan R. Walker of Dupot and James E. Kalley or Remington U.S.A. in 1957
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

22. 

The salient feature of functional organisation is

A. strict adherence to specifications
B. separation of planning and design part
C. each individual maintains functional efficiency
D. work is properly planned and distributed
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

23. 

The object of technical planning, is

A. preparation of specifications
B. preparation of estimates
C. initiating the procurement action of resources
D. taking remedial action for likely bottleneck in the execution
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

24. 

The difference between the time avail-to do a job and the time required to do the job, is known as

A. event
B. float
C. duration
D. constraint.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2026 IndiaBIX. All Rights Reserved.

Report