Construction Management - Section 1 (2)

  • Home
  • Civil Engineering
  • Civil Engineering Questions and Answers
  • Construction Management - Section 1
Directions to Solve

Construction Management - Section 1

In this portion, there are many questions available to solve
which are related to construction management and every question is important.

9. 

If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be

A. started 5 days later
B. completed 5 days later
C. performed at slower rate in 15 days
D. all the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

10. 

The time which results in the leasi, possible construction cost of an activity, is known

A. normal time
B. slow time
C. crash time
D. standard time.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

11. 

A CPM family includes

A. CPA (Critical Path Analysis)
B. CPP (Critical Path Plotted)
C. MCE (Minimum Cost Expenditure)
D. CPS (Critical Path Scheduling)
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

12. 

The estimated time required to perform an activity, is known as

A. event
B. dummy
C. duration
D. float.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

13. 

The main principle of an organisation, is

A. unity of command
B. cohegency
C. effective control at all levels
D. delegation of authority
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

14. 

An Executive Engineer may have powers upto

A. Rs. 25,000
B. Rs. 50,000
C. Rs. 100,000
D. Rs. 200,000
E. Rs. 500,000

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

15. 

Site order book is used for recording

A. instructions by the executive engineers
B. construction measurements
C. issue of store equipments
D. names of the casual labour.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

16. 

A construction schedule is prepared after collecting

A. number of operations
B. output of labour
C. output of machinery
D. quantity of various items
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2026 IndiaBIX. All Rights Reserved.

Report