Railways is portion of Civil Engineering and in this section you will get all the basic
questions related to railways which you can solve easily.

41. 

Best ballast contains stones varying in size from

A. 1.5 cm to 3 cm
B. 2.0 cm to 4 cm
C. 2.0 cm to 5 cm
D. 2.5 cm to 6 cm

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

42. 

Boxing of ballast is done

A. under rails
B. at the rails
C. in between two rails
D. in between two sleepers.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

43. 

Minimum depth of ballast prescribed of B.G. trunk lines of Indian Railways, is

A. 20 cm
B. 15 cm
C. 25 cm
D. 30 cm
E. 35 cm

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

44. 

Pick up the incorrect statement from the following:

A. Fish plates fit the underside of the rail head
B. Fish plates fit the top of the rail foot
C. Fish plates fit the web of the rail section
D. Cross sectional area of fish plates, is normally the same as that of the rail section.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

45. 

Pick up the correct statement from the following :

A. Rails are directly laid over hard wooden sleepers and fixed with spikes
B. Adzing is done on hard wooden sleepers
C. Bearing plates are used on soft wooden sleepers
D. Chairs are used for bull headed rails
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

46. 

The weight of the rails depends upon

A. gauge of the tracks
B. speed of trains
C. spacing of sleepers
D. nature of traffic
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

47. 

The first Indian railway was laid in

A. 1775
B. 1804
C. 1825
D. 1853
E. 1876

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

48. 

To design a cross-over between parallel tracks, the required components are :

A. two switch, points, two acute angle crossings and two check rails
B. two switch points, two acute angle crossings and four check rails
C. two switch points, two acute angle crossings and six check rails
D. none of these.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2026 IndiaBIX. All Rights Reserved.

Report