25. 

If D is distance between centres of two parallel track of gauge G, then, total length of cross-over (from the point of commencement to the point of termination) with an intermediate straight portion and N crossing, is given by

 

A. DN + G (N + 1 √+ N2)
B. DN + G (2N + 1 √+ N2)
C. DN + G (3N + 1 √+ N2)
D. DN + G (4N + l √+N2)

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

26. 

If L1 and L2 are actual and theoretical lengths of a tongue rail, d is heel divergence and t is thickness of tongue rail at toe, the switch angle α is

A. 57-17-125-1
B. 57-17-125-2
C. 57-17-125-3
D. 57-17-125-4
E. 57-17-125-5

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

27. 

Wooden sleepers used on the girders of bridges, are generally made of

A. sal
B. chir
C. teak
D. deodar.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

28. 

Distance between inner faces of the flanges, is kept

A. equal to the gauge distance
B. slightly less than the gauge distance
C. slightly more than the gauge distance
D. none of these.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

29. 

To prevent percolation of water into formation, moorum is used as a blanket for

A. black cotton soil
B. sandy soil
C. clayey soil
D. all the above.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

30. 

A scissors cross-over consists of

A. two pairs of points, four acute angle crossings and two obtuse angle crossings
B. four pairs of points, four acute angle crossings and four obtuse angle crossings
C. four pairs of points, six acute angle crossings and two obtuse angle crossings
D. two pairs of points, six acute angle crossings and four obtuse angle crossings.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

31. 

Rail section first designed on Indian railways, was

A. double headed
B. bull headed
C. flat footed
D. (a) and (b) simultaneously

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

32. 

In India the rails are manufactured by

A. open hearth process
B. duplex process
C. both (a) and (b)
D. neither (a) nor (b)

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report