33. 

Rails are bent to correct curvature if the degree of curve, is more than

A. 1°
B. 2°
C. 3°
D. 4°
E. 6°

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

34. 

If L is length of a rail and R is the radius of a curve, the versine h for the curve, is

A. 52-17-34-1
B. 52-17-34-2
C. 52-17-34-3
D. 52-17-34-4
E. 52-17-34-5

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

35. 

A kink is made in stock rails, ahead of the toe of switch at a distance of

A. 10 cm
B. 15 cm
C. 20 cm
D. 30 cm

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

36. 

In railways a triangle is mainly provided for

A. diverting trains from the main line to branch line
B. crossing over between parallel tracks
C. changing direction of engines through 180°
D. shunting wagons in yards.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

37. 

Pot sleepers are in the form of

A. a number of bowls connected together with a tie bar
B. two bowls placed under each rail and connected together with a tie bar
C. two bowls placed under two rails and the one between the rails
D. none of these.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

38. 

Coal ash (or cinder) is used in initial stages of a new construction of railway for

A. wooden sleepers
B. steel sleepers
C. cast iron sleepers
D. none of these.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

39. 

Distance between the inner rail and check rail provided on sharp curve, is

A. 40 mm
B. 42 mm
C. 44 mm
D. 46 mm
E. 50 mm

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

40. 

For holding a rail in position, no chairs are used for

A. flat footed rails
B. bull headed rails
C. double headed rails
D. both (a) and (b)

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2026 IndiaBIX. All Rights Reserved.

Report