Estimating and Costing - Section 1 (6)

  • Home
  • Civil Engineering
  • Civil Engineering Questions and Answers
  • Estimating and Costing - Section 1
Directions to Solve

Estimating and Costing - Section 1

Calculating Estimates and Cost in this field is important. You can
solve estimating and costing type questions which are available in this section.

41. 

Brick walls are measured in sq. m if the thickness of the wall is

A. 10 cm
B. 15 cm
C. 20 cm
D. None of these.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

42. 

The brick work is measured in sq metre, in case of

A. Honey comb brick work
B. Brick flat soling
C. Half brick walls or the partition
D. All the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

43. 

Pick up the correct statement from the following:

A. The bent up bars at a support resist the negative bending moment
B. The bent up bars at a support resist the sharing force
C. The bending of bars near supports is generally at 45°
D. All the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

44. 

Pick up the item of work not included in the plinth area estimate

A. Wall thickness
B. Room area
C. Verandah area
D. W.C. area
E. Courtyard area.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

45. 

As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken

A. 1.80 litres for 5 to 10 users
B. 1.20 litres for 15 users
C. 1.35 for 20 users
D. All the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

46. 

The order of booking dimensions is

A. Length, breadth, height
B. Breadth, length, height
C. Height, breadth, length
D. None of these.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

47. 

The correct prismoidal formula for volume is

A. D [first area + last area + ∑ Even area + 2 ∑ odd areas]
B. 16-23-72-2 [first area + last area + 4 ∑ Even area + 2 ∑ odd areas]
C. 16-23-72-2 [first area + last area + 2 ∑ Even area + 4 ∑ odd areas]
D. 16-23-72-3 [first area + last area + 2 ∑ Even area + 4 ∑ odd areas].

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

48. 

A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.

A. 26, 000 m3
B. 26, 500 m3
C. 27, 000 m3
D. 27, 500 m3

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report