Estimating and Costing - Section 1

Calculating Estimates and Cost in this field is important. You can
solve estimating and costing type questions which are available in this section.

17. 

The damp proof course (D.P.C.) is measured in

A. Cub.m
B. Sq m
C. Metres
D. None of these

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

18. 

The main factor to be considered while preparing a detailed estimate, is

A. Quantity of the materials
B. Availability of materials
C. Transportation of materials
D. Location of site and local labour charges
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

19. 

The expected out turn of 12 mm plastering with cement mortar is

A. 2.5 sq m
B. 4.0 sq m
C. 6.0 sq m
D. 8.0 sq m
E. 10 sq m

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

20. 

The most reliable estiamte is

A. Detailed estimate
B. Preliminary estimate
C. Plinth area estimate
D. Cube rate estimate
E. None of these.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

21. 

If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by

A. Mid-section formula
B. Trapezoidal formula
C. Prismoidal formula
D. All the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

22. 

The area of a sloping surface of a protective embankment of mean height d, side slopes S : 1 and length L is

 

A. d x d x s
B. √d2 x (ds)2
C. L.D √1 + s2
D. 2 LD √1 + s2

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

23. 

The value of 'C' of Indian type W.C. shown in the given figure is :

15-23-60

A. 400 mm
B. 450 mm
C. 500 mm
D. 550 mm

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

24. 

The item of steel work which is measured in sq.m, is

A. Collapsible gates
B. Rolling shutters
C. Steel doors
D. Ventilators and glazing.
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report