Estimating and Costing - Section 1 (4)

  • Home
  • Civil Engineering
  • Civil Engineering Questions and Answers
  • Estimating and Costing - Section 1
Directions to Solve

Estimating and Costing - Section 1

Calculating Estimates and Cost in this field is important. You can
solve estimating and costing type questions which are available in this section.

25. 

In the mid-section formula

A. The mean depth is the average of depths of two consecutive sections
B. The area of mid-sections is calculated by using mean depth
C. The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two sections
D. The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections
E. (a), (b) and (c) of the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

26. 

The inspection pit or chamber is a manhole provided in a base drainage system

A. at every change of direction
B. at every change of gradient
C. at every 30 m intervals
D. at the point where vertical soil pipe joins the house drain
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

27. 

The item of the brick structure measured in sq.m, is

A. Reinforced brick work
B. Broken glass coping
C. Brick edging
D. Brick work in arches.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

28. 

The minimum width of a septic tank is taken

A. 70 cm
B. 75 cm
C. 80 cm
D. 90 cm

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

29. 

For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

A. 0.200 m3
B. 0.247 m3
C. 0.274 m3
D. 0.295 m3

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

30. 

The plinth area of a building not includes

A. area of the walls at the floor level
B. area of stair cover
C. internal shaft for sanitary installations up to 2 sq m. in area
D. lift and wall including landing
E. area of cantilevered porch.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

31. 

The area of the cross-section of a road fully in banking shown in the given figure, is

17-23-77

A. 17-23-77-1
B. 17-23-77-2
C. 17-23-77-4
D. None of these

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

32. 

The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

A. 1.5 m3
B. 2.5 m3
C. 3.5 m3
D. 5.0 m3

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2026 IndiaBIX. All Rights Reserved.

Report