Calculating Estimates and Cost in this field is important. You can
solve estimating and costing type questions which are available in this section.
| 25. | In the mid-section formula |
|||||||||
Answer: Option E Explanation: No answer description available for this question. Let us discuss. |
| 26. | The inspection pit or chamber is a manhole provided in a base drainage system |
|||||||||
Answer: Option E Explanation: No answer description available for this question. Let us discuss. |
| 27. | The item of the brick structure measured in sq.m, is |
|||||||
Answer: Option B Explanation: No answer description available for this question. Let us discuss. |
| 28. | The minimum width of a septic tank is taken |
|||||||
Answer: Option B Explanation: No answer description available for this question. Let us discuss. |
| 29. | For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is |
|||||||
Answer: Option C Explanation: No answer description available for this question. Let us discuss. |
| 30. | The plinth area of a building not includes |
|||||||||
Answer: Option E Explanation: No answer description available for this question. Let us discuss. |
| 31. | The area of the cross-section of a road fully in banking shown in the given figure, is |
|||||||
Answer: Option A Explanation: No answer description available for this question. Let us discuss. |
| 32. | The expected out turn of cement concrete 1 : 2 : 4 per mason per day is |
|||||||
Answer: Option D Explanation: No answer description available for this question. Let us discuss. |