Estimating and Costing - Section 1 (5)

  • Home
  • Civil Engineering
  • Civil Engineering Questions and Answers
  • Estimating and Costing - Section 1
Directions to Solve

Estimating and Costing - Section 1

Calculating Estimates and Cost in this field is important. You can
solve estimating and costing type questions which are available in this section.

33. 

Pick up the correct statement from the  following:

A. The estimated value of the work excluding the amount for contigencies, work charged establishment, tool and plants, is called work value
B. The actual expenditure involved to complete a work including incidental, establishment and travelling charges, is called actual cost
C. The formal acceptance by the administrative department for incurring an expenditure on the work, is called administrative approval
D. The order of a competent authority sanctioning a properly detailed estimate of the cost of a work of construction or repair is called technical sanction
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

34. 

The concrete work for the following part of the building of specified thickness is measured in square metres

A. Root slabs
B. Floors
C. D.P.C.
D. Wall panels
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

35. 

Pick up the incorrect statement regarding a master trap from the following :

A. It is provided in between the lower end of the house drain and the street sewer
B. It is provided a cleaning eye at the top of the trap
C. The height of fresh air inlet pipe fixed vertically with wall is 3 m
D. The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe
E. The water seal is less than that of ordinary traps.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

36. 

While preparing a detailed estimate

A. Dimension should be measured correct to 0.01 m
B. Area should be measured correct to 0.01 sqm
C. Volume should be measured correct to O.Olcum
D. All the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

37. 

The height of the sink of wash basin above floor level is kept

A. 60 cm
B. 70 cm
C. 75 cm to 80 cm
D. 80 cm

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

38. 

In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

A. breadth of the wall
B. half breadth of wall on each side
C. one fourth breadth of wall on each side
D. None of these.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

39. 

In case of laying gullies, siphons, intercepting traps, the cost includes

A. Setting and laying
B. Bed concreting
C. Connection to drains
D. All of these.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

40. 

Pick up the correct statement in case of water supply.

A. Pipes laid in trenches and pipes fixed to walls are measured separately
B. Cutting through walls and floors are included with the item
C. Pipes are classified according to their sizes and quality
D. In laying pipes, the method of jointing and fixing is specifically specified
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report