1. | The detention period in a septic tank is assumed |
|||||||
Answer: Option C Explanation: No answer description available for this question. Let us discuss. |
2. | The cross-sections for a highway is taken at |
|||||||||
Answer: Option E Explanation: No answer description available for this question. Let us discuss. |
3. | The assumption on which the trapezoidal formula for volumes is based, is |
|||||||
Answer: Option D Explanation: No answer description available for this question. Let us discuss. |
4. | According to ISI method of measurement, the order of the sequence is |
|||||||
Answer: Option A Explanation: No answer description available for this question. Let us discuss. |
5. | The measurement is not made in square metres in case of |
|||||||
Answer: Option D Explanation: No answer description available for this question. Let us discuss. |
6. |
|
|||||||||
Answer: Option E Explanation: No answer description available for this question. Let us discuss. |
7. | Pick up the incorrect statement from the following: |
|||||||
Answer: Option C Explanation: No answer description available for this question. Let us discuss. |
8. | The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as |
|||||||
Answer: Option D Explanation: No answer description available for this question. Let us discuss. |