Tunnelling - Section 1 (2)

  • Home
  • Civil Engineering
  • Civil Engineering Questions and Answers
  • Tunnelling - Section 1
Directions to Solve

Tunnelling - Section 1

The questions related to tunneling is available in the form of MCQs and in this
section you will find all the important questions.

9. 

For B.G. single track, the section of the tunnel must have a width

A. 4.2 m to 4.5 m
B. 4.5 m to 4.8 m
C. 4.9 m to 5.5 m
D. 5.5 m to 5.8 m

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

10. 

The cut of a tunnel face is shown in given figure. This is called

23-24-32

A. Michigan cut
B. Burn cut
C. Fan cut
D. Horizontal cut.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

11. 

Pick up the explosive used for tunnelling in soft rocks from the following :

A. blasting gelatine
B. special gelatine
C. ammonia dynamite
D. semi-gelatine.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

12. 

Railway tunnels, are generally

A. polycentric
B. rectangular
C. parabolic
D. circular
E. none of these.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

13. 

In the wooded bulk-head, used for mucking in steep grade tunnels,

A. one opening is provided
B. two openings are provided
C. three openings are provided
D. no opening is provided.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

14. 

The tunnels, the artificial underground passages are constructed for :

A. highways
B. railways
C. sewerage
D. water supply project
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

15. 

For full face method, the excavation to be done is generally divided into

A. two sections
B. three sections
C. four sections
D. five sections.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

16. 

For initial surveys of tunnels, the following activities are involved:

1. Marking portal point with concrete pillars on the ground
2. Marking tunnel obligatory points on the topographical maps
3. Preliminary setting of the tunnel on the topographical Survey of India maps
3. Driving lines between the fixed obligatory points.
The correct sequence of the activities is :

A. 3 2 4 1
B. 1 2 3 4
C. 4 3 1 2
D. 2 4 3 1

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report