1. 

Which one of the following methods is adopted for permanent drainage of tunnels :

A. provision of longitudinal drains
B. continuous open drains
C. concrete lining
D. grouting with cement or chemicals
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

2. 

For hauling muck from the tunnel, the following type of muck-car is used :

A. muck box
B. balle-ship
C. side dump car
D. U-bottom
E. All of these.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

3. 

High pressure grouting is generally restored for concreting in the lining if the rock strata is:

A. highly fissured
B. poor
C. likely to get seepage of water
D. All of the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

4. 

The length of the needle beam used in needle beam method of tunnelling is usually

A. 2 m to 4 m
B. 2.5 m to 6 m
C. 4 m to 7 m
D. 5 m to 6 m

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

5. 

In the given figure drill holes, heading, mucking and benching are mumbered as 1, 2, 3, 4 The correct sequence is :

22-24-20

A. 4 1 2 3
B. 1 2 3 4
C. 4 1 3 2
D. 3 4 1 3

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

6. 

Pick up the correct statement from the following:

A. The topographical maps of the Survey of India are useful in the mountainous region for tunnelling.
B. The height point on the ridge is fixed with the help of reciprocal ranging
C. The accuracy of 1 in 10, 000 is required for planimetric control
D. 1 second theodolite is used for angular measurement to achieve an angular error of 15 N where N is number of angles
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

7. 

An overhead track on a large truss frame is required in case of car changer by

A. the grass hopper method
B. the passing track method
C. California crossing method
D. Dixon conveyor method.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

8. 

Which one of the following methods is generally adopted for tunnelling in firm ground

A. Full face method
B. Top heading and benching method
C. Drift method
D. All the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report