Water Resources Engineering - Section 1 (4)

  • Home
  • Civil Engineering
  • Civil Engineering Questions and Answers
  • Water Resources Engineering - Section 1
Directions to Solve

Water Resources Engineering - Section 1

There are MCQs available on this field water resources
management and you can test your skills by completing these MCQs.

25. 

The critical depth in a channel can be produced

A. by raising the bottom of the channel
B. by lowering the bottom of the channel
C. by decreasing the width of the channel
D. by increasing the width of the channel
E. both (a) and (c) of above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

26. 

While calculating the average depth of annual precipitation in a catchment basin, importance to individual raingauge station is given in

A. Arithmetical method
B. Thiessen's mean method
C. Isohyetal method
D. both (a) and (b)
E. both (b) and (c).

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

27. 

For determination of average annual precipitation in a catchment basin, the best method is

A. Arithmetical method
B. Thiessen's mean method
C. Isohyetal method
D. None of these.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

28. 

If a gauge is installed perpendicular to the slope, its measurement is reduced by multiplying

A. sine of the angle of inclination with vertical
B. cosine of the angle of inclination with vertical
C. tangent of the angle of inclination with vertical
D. calibration coefficient of the gauge.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

29. 

The deficiency in rain catch due to vertical acceleration of air forced upward over the gauge, is

A. greater for heavy rain
B. greater for lighter rain
C. greater for large drops
D. lesser for small rain drops.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

30. 

In India the recording type rain gauge generally used, is

A. weighing type
B. tipping type
C. float recording type
D. none of these.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

31. 

A recording type rain gauge

A. produces a mass curve of rain fall
B. records the cumulative rain
C. is sometimes called integrating rain gauge or continuous rain gauge
D. all the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

32. 

In India, rain fall is generally recorded at

A. 8 A.M.
B. 12 Noon
C. 4 P.M.
D. 8 P.M.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2026 IndiaBIX. All Rights Reserved.

Report