Waste water engineering is a branch of this engineering and in
the following section you will find the important MCQs related to this field.
| 33. | An inverted siphon is designed generally for |
|||||||
Answer: Option C Explanation: No answer description available for this question. Let us discuss. |
| 34. | If the over land flow from the critical point to the drain is 8 km and the difference in level is 12.4 m, the inlet time is |
|||||||
Answer: Option C Explanation: No answer description available for this question. Let us discuss. |
| 35. | Self-cleansing velocity is |
|||||||
Answer: Option C Explanation: No answer description available for this question. Let us discuss. |
| 36. | In a fully mechanised composting plant, involves |
|||||||
Answer: Option D Explanation: No answer description available for this question. Let us discuss. |
| 37. | For the survival of fish in a river stream, the minimum dissolved oxygen is prescribed |
|||||||
Answer: Option B Explanation: No answer description available for this question. Let us discuss. |
| 38. | In olden days the type of section adopted in trunk and out fall sewers was |
|||||||
Answer: Option B Explanation: No answer description available for this question. Let us discuss. |
| 39. | Pick up the correct statement from the following : |
|||||||
Answer: Option D Explanation: No answer description available for this question. Let us discuss. |
| 40. | The width of a rectangular sewer is twice its depth while discharging 1.5 m/sec. The width of the sewer is |
|||||||
Answer: Option C Explanation: No answer description available for this question. Let us discuss. |