Waste water engineering is a branch of this engineering and in
the following section you will find the important MCQs related to this field.
| 25. | Pick up the in-correct statement from the following : |
|||||||
Answer: Option C Explanation: No answer description available for this question. Let us discuss. |
| 26. | In primary sedimentation, the 0.2 mm inorganic solids get separated if specific gravity is |
|||||||||
Answer: Option D Explanation: No answer description available for this question. Let us discuss. |
| 27. | The screens are fixed |
|||||||
Answer: Option C Explanation: No answer description available for this question. Let us discuss. |
| 28. | The dimensions of a rectangular settling tank are : length 24 m, width 6 m and depth 3 m. If 2 hour detention period for tanks is recommended, the rate of flow of sewage per hour, is |
|||||||||
Answer: Option D Explanation: No answer description available for this question. Let us discuss. |
| 29. | The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is |
|||||||
Answer: Option A Explanation: No answer description available for this question. Let us discuss. |
| 30. | For treating the sewage of a large city, you will recommend |
|||||||
Answer: Option A Explanation: No answer description available for this question. Let us discuss. |
| 31. | When drainage to sewage ratio is 20, the peak dry weather flow is |
|||||||
Answer: Option B Explanation: No answer description available for this question. Let us discuss. |
| 32. | A rainfall may be classified as acidic if its pH value is less or equal to |
|||||||
Answer: Option C Explanation: No answer description available for this question. Let us discuss. |