IndiaBIX
IndiaBIX
Start typing & press "Enter" or "ESC" to close
  • Home
  • Jobs
  • Results
  • Current Affairs
  • GK
  • Online Test
  • HR Interview
  • BLOG

Surveying - Section 1 (2)

  • Home
  • Civil Engineering
  • Civil Engineering Questions and Answers
  • Surveying - Section 1
Directions to Solve

Surveying - Section 1

Surveying is a part of Civil Engineering and here we provide all the important
MCQs of this topic. You can solve these MCQs by clicking this section.

9. 

The slope correction for a length of 30 m along a gradient of 1 in 20, is

A. 3.75 cm
B. 0.375 cm
C. 37.5 cm
D. 2.75 cm.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

10. 

For a closed traverse the omitted measurements may be calculated

A. length of one side only
B. bearing of one side only
C. both length and bearing of one side
D. length or bearing of adjacent side
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

11. 

The bearings of the lines AB and BC are 146° 30' and 68° 30'. The included angle ABC is

A. 102°
B. 78°
C. 45
D. none of these.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

12. 

The probable error of the adjusted bearing at the middle is

 

 

A. 1by2r√n
B. 1-div-1by3r√n
C. 1-div-1by4r√n
D. 56-3.94-4r√n

Answer: Option

Explanation:

View Answer Discuss Workspace Report

13. 

Offsets are measured with an accuracy of 1 in 40. If the point on the paper from both sources of error (due to angular and measurement errors) is not to exceed 0.05 cm on a scale of 1 cm = 20 m, the maximum length of offset should be limited to

A. 14.14
B. 28.28 m
C. 200 m
D. none of these.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

14. 

The difference of level between a point below the plane of sight and one above, is the sum of two staff readings and an error would be produced equal to

A. the distance between the zero of gradient and the foot of the staff
B. twice the distance between the zero of graduation and the foot of the staff
C. thrice the distance between the zero of graduation and the foot of the staff
D. none of the above.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

15. 

The most reliable method of plotting a theodolite traverse, is

A. by consecutive co-ordinates of each station
B. by independent co-ordinates of each station
C. by plotting included angles and scaling off each traverse leg
D. by the tangent method of plotting.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

16. 

If θ is the slope of the ground and l is the measured distance, the correction is

A. 2l sin2 θ/2
B. 2l cos2 θ/2
C. 2l tan2 θ/2
D. 2l cot2 θ/2.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report