Directions to Solve

Surveying - Section 1

Surveying is a part of Civil Engineering and here we provide all the important
MCQs of this topic. You can solve these MCQs by clicking this section.

1. 

Pick up the correct statement  from the following :

A. Box sextant is used for the measurement of horizontal angles
B. Cross staff is used for setting out right angles
C. Gradiometer is used for setting out any required gradient
D. Line ranger is used for locating intermediate stations on a survey line
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

2. 

Keeping the instrument height as 1.5 m, length of staff 4 m, the slope of the ground as 1 in 10, the sight on the down-slope, must be less than

A. 30 m
B. 25 m
C. 20 m
D. 15 m

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

3. 

ABCD is a regular parallelogram plot of land whose angle BAD is 60°. If the bearing of the line AB is 30°, the bearing of CD, is

A. 90°
B. 120
C. 210°
D. 270°

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

4. 

For true difference in elevations between two points A and B, the level must be set up

A. at any point between A and B
B. at the exact mid point of A and B
C. near the point A
D. near the point B.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

5. 

The sensitiveness of a level tube decreases if

A. radius of curvature of its inner surface is increased
B. diameter of the tube is increased
C. length of the vapour bubble is increased
D. both viscosity and surface tension are increased.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

6. 

If the radius of a simple curve is R, the length of the chord for calculating offsets by the method of chords produced, should not exceed.

A. R/10
B. R/15
C. R/20
D. R/25.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

7. 

For the construction of highway (or railway)

A. longitudinal sections are required
B. cross sections are required
C. both longitudinal and cross sections are required
D. none of these.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

8. 

The main principle of surveying is to work

A. from part to the whole
B. from whole to the part
C. from higher level to the lower level
D. from lower level to higher level.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report