Building Construction - Section 1 (5)

  • Home
  • Civil Engineering
  • Civil Engineering Questions and Answers
  • Building Construction - Section 1
Directions to Solve

Building Construction - Section 1

building construction section is full of important question which are
asked in this field and you will get these MCQs and can solve to test your skills.

33. 

The concrete slump recommended for beams and slabs ; is

A. 25 to 50 mm
B. 25 to 75 mm
C. 30 to 125 mm
D. 50 to 100 mm
E. none of these.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

34. 

The portion of a brick cut across the width, is called

A. closer
B. half brick
C. bed
D. bat.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

35. 

The loose pockets in soil mass can be bridged safely by providing a raft foundation provided the soft area is smaller than

A. the column spacing
B. one-third the column spacing
C. half the column spacing
D. three-fourth the column spacing
E. none of these.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

36. 

Black cotton soil is unsuitable for foundations because its

A. bearing capacity is low
B. permeability is uncertain
C. particles are cohesive
D. property to undergo a volumetric change due to variation of moisture content.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

37. 

The process of making the back ground rough, before plastering, is

A. dubbing
B. hacking
C. blistering
D. peeling.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

38. 

The raft slab is projected beyond the outer walls of the structure by

A. 5 to 10 cm
B. 15 to 20 cm
C. 25 to 30 cm
D. 30 to 45 cm
E. 60 cm.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

39. 

The under surface of an arch, is called

A. soffit
B. intrados
C. haunch
D. back.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

40. 

The taper of precast concrete pile should not be more than

A. 1 cm per metre length
B. 2 cm per metre length
C. 4 cm per metre length
D. 5 cm per metre length.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report