IndiaBIX
IndiaBIX
Start typing & press "Enter" or "ESC" to close
  • Home
  • Jobs
  • Results
  • Current Affairs
  • GK
  • Online Test
  • HR Interview
  • BLOG

Chain Rule - General Questions (1)

  • Home
  • Aptitude
  • Chain Rule
  • Chain Rule - General Questions
1. 

4 mat-weavers can weave 4 mats in 4 days. At the same rate, how many mats would be woven by 8 mat-weavers in 8 days?

A. 4
B. 8
C. 12
D. 16

Answer: Option D

Explanation:

Let the required number of bottles be x.

More weavers, More mats (Direct Proportion)

More days, More mats (Direct Proportion)

Wavers 4 : 8 1-sym-cbrace-h2 :: 4 : x
Days 4 : 8

 4 x 4 x x = 8 x 8 x 4

 x = (8 x 8 x 4)
(4 x 4)

 x = 16.

View Answer Discuss Workspace Report

2. 

36 men can complete a piece of work in 18 days. In how many days will 27 men complete the same work?

A. 12
B. 18
C. 22
D. 24
E. None of these

Answer: Option D

Explanation:

Let the required number of days be x.

Less men, More days (Indirect Proportion)

 27 : 36 :: 18 : x        27 x x = 36 x 18

 x = 36 x 18
27

 x = 24.

View Answer Discuss Workspace Report

3. 

An industrial loom weaves 0.128 metres of cloth every second. Approximately, how many seconds will it take for the loom to weave 25 metres of cloth?

A. 178
B. 195
C. 204
D. 488

Answer: Option B

Explanation:

Le the required time be x seconds.

More metres, More time (Direct Proportion)

 0.128 : 25 :: 1 : x        0.128x = 25 x 1

x = 25 = 25 x 1000
0.128 128

 x = 195.31.

 Required time = 195 sec (approximately).

View Answer Discuss Workspace Report

4. 

In a camp, there is a meal for 120 men or 200 children. If 150 children have taken the meal, how many men will be catered to with remaining meal?

A. 20
B. 30
C. 40
D. 50

Answer: Option B

Explanation:

There is a meal for 200 children. 150 children have taken the meal.

Remaining meal is to be catered to 50 children.

Now, 200 children  120 men.

50 children  1-sym-oparen-h1 120 x 50 1-sym-cparen-h1 = 30 men.
200
View Answer Discuss Workspace Report

5. 

A flagstaff 17.5 m high casts a shadow of length 40.25 m. The height of the building, which casts a shadow of length 28.75 m under similar conditions will be:

A. 10 m
B. 12.5 m
C. 17.5 m
D. 21.25 m

Answer: Option B

Explanation:

Let the height of the building x metres.

Less lengthy shadow, Less in the height (Direct Proportion)

 40.25 : 28.75 :: 17.5 : x        40.25 x x = 28.75 x 17.5

x = 28.75 x 17.5
40.25

 x = 12.5

View Answer Discuss Workspace Report

6. 

If 7 spiders make 7 webs in 7 days, then 1 spider will make 1 web in how many days?

A. 1
B. 7/2
C. 7
D. 49

Answer: Option C

Explanation:

Let the required number days be x.

Less spiders, More days (Indirect Proportion)

Less webs, Less days (Direct Proportion)

Spiders 1 : 7 1-sym-cbrace-h2 :: 7 : x
Webs 7 : 1

 1 x 7 x x = 7 x 1 x 7

 x = 7.

View Answer Discuss Workspace Report

7. 

A wheel that has 6 cogs is meshed with a larger wheel of 14 cogs. When the smaller wheel has made 21 revolutions, then the number of revolutions mad by the larger wheel is:

A. 4
B. 9
C. 12
D. 49

Answer: Option B

Explanation:

Let the required number of revolutions made by larger wheel be x.

Then, More cogs, Less revolutions (Indirect Proportion)

 14 : 6 :: 21 : x        14 x x = 6 x 21

 x = 6 x 21
14

 x = 9.

View Answer Discuss Workspace Report

8. 

In a dairy farm, 40 cows eat 40 bags of husk in 40 days. In how many days one cow will eat one bag of husk?

A. 1
B. 1/40
C. 40
D. 80

Answer: Option C

Explanation:

Let the required number of days be x.

Less cows, More days (Indirect Proportion)

Less bags, Less days (Direct Proportion)

Cows 1 : 40 1-sym-cbrace-h2 :: 40 : x
Bags 40 : 1

 1 x 40 x x = 40 x 1 x 40

 x = 40.

View Answer Discuss Workspace Report

  • 1
  • 2

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2026 IndiaBIX. All Rights Reserved.

Report