Concrete Technology - Section 1

This section is full with the important questions related to this field
and you can give test if you want to enhance the aptitude ability.

41. 

According to I.S. : 456, the number of grades of concrete mixes, is

A. 3
B. 4
C. 5
D. 6
E. 7

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

42. 

For ensuring quality of concrete, use

A. single sized aggegates
B. two sized aggregate
C. graded aggregates
D. coarse aggregates.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

43. 

M10 grade of concrete approximates

A. 1 : 3 : 6 mix
B. 1 : 1 : 2 mix
C. 1 : 2 : 4 mix
D. 1 : 1.5 : 3 mix
E. none of these.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

44. 

For given water content, workability decreases if the concrete aggregates contain an excess of

A. thin particles
B. flat particles
C. elongated particles
D. flaky paticles
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

45. 

Wp and Wf are the weights of a cylinder containing partially compacted and fully compacted concrete. If the compaction factor 58-12-92 is 0.95, the workability of concrete is

A. extremely low
B. very low
C. low
D. high
E. none of these.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

46. 

Under normal conditions using an ordinary cement, the period of removal of the form work, is :

A. 7 days for beam soffits
B. 14 days for bottom slabs of spans 4.6 m and more
C. 21 days for bottom beams over 6 m spans
D. 2 days for vertical sides of columns
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

47. 

If 1500 g of water is required to have a cement paste 1875 g of normal consistency, the percentage of water is,

A. 20%
B. 25%
C. 30%
D. 35%
E. 40%

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

48. 

For quality control of Portland cement, the test essentially done is

A. setting time
B. soundness
C. tensile strength
D. consistency
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

View Answer Discuss Workspace Report

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

Questions & Answers

Aptitude Chemical Engineering Civil Engineering Computer Science & Engineering Current Affairs Data Interpretation Electrical & Electronics Engineering Electronics & Communication Engineering General Knowledge Logical Reasoning Mechanical Engineering Non Verbal Reasoning Verbal Ability Verbal Reasoning

Interviews

HR Interview

Jobs

Sarkari Jobs

Results

Rojgar ResultSarkari Result

Admission

Admission 2023

Admit Card

Admit Card 2023

Answer Key

Answer Key 2023
copyright
Privacy Policy
© 2025 IndiaBIX. All Rights Reserved.

Report